Viper Captain
3x6 3-lane continuous rail routed track


Designed, built and purchased in 2020, funded by stimulus check #1.
The idea was to utilize my old captain's platform bed. This fit my space and budget at the time.
The time was right, resources of both time and funds aligned and the birth of a new race track is about to be here.